top of page

MD Anderson Cancer Center West Houston

Owner:

MD Anderson Cancer Center

Category:

Foundations, Elevated Concrete, Site Concrete, Concrete Material, Concrete Placement, Concrete Finishing

As MD Anderson’s first free-standing clinical building outside the Texas Medical Center, it was built on 36 acres and includes approximately 175,000 square feet. Building Concrete Solutions’ formwork system of choice for this project was RMD’s Alshor Plus. This specific project was designed as a Pan-Type floor system. The assembly time for the system was minimal, allowing the team to pre-assemble the slab tables while a different crew was setting up the frames that would provide the support. The safety benefit of this system is that all parts are bolted down, decreasing the risk of falling object during the stripping process. All columns forms and beam sides were pre-assembled at our fabrication yard for quality control and increased safety. Phase 1: Foundation and site: auger cast piles, caps, grade beams, 53,000 SF slab on grade, 17,200 SF walks and 215,000 SF paving Phase 2: Elevated structure: 242,300 SF pan slab
Contact

777 Benmar Dr., Suite 455
Houston, Texas 77060
281.272.7900

© 2025 All rights reserved Building Concrete Solutions

bcs-bw
bottom of page